No
Yes
View More
View Less
Working...
Close
OK
Cancel
Confirm
System Message
Delete
Schedule
An unknown error has occurred and your request could not be completed. Please contact support.
Scheduled
Scheduled
Wait Listed
Personal Calendar
Speaking
Conference Event
Meeting
Interest
There aren't any available sessions at this time.
Conflict Found
This session is already scheduled at another time. Would you like to...
Loading...
Please enter a maximum of {0} characters.
{0} remaining of {1} character maximum.
Please enter a maximum of {0} words.
{0} remaining of {1} word maximum.
must be 50 characters or less.
must be 40 characters or less.
Session Summary
We were unable to load the map image.
This has not yet been assigned to a map.
Search Catalog
Reply
Replies ()
Search
New Post
Microblog
Microblog Thread
Post Reply
Post
Your session timed out.
This web page is not optimized for viewing on a mobile device. Visit this site in a desktop browser to access the full set of features.
HxGN LIVE 2015 Las Vegas
Add to My Favorites
Remove from My Favorites

9204 - How Can Geodetical Measurements Help Reduce Costs and Risks During Tunnelling?

Session Speakers
Session Description

The tunnel surveying systems from Amberg Technologies support tunnelling in all construction phases. The system solutions under the umbrella name of Amberg TMS combine precise measuring instruments from Leica Geosystems with task-specific software from Amberg Technologies. Modern tunnelling is subject to numerous demands: Tunnelling companies must keep costs low, finish projects in less time and still keep up with the high quality and safety standards. Subsequently there is less time for preparation, a need for a simplified transfer of planning data, flexible operational capability and the use of high-performance instruments. This combined with a new innovative software solution, which allows to control tunnel headings with a mobile tablet application and a simple work flow driven user interface, helps to save time, reduces downtimes in the tunnelling process and minimises the project costs.


Additional Information
Breakout Session
45 minutes
Session Schedule
    Similar Sessions
    Session Rating
    This session has not been rated yet /5.0